List your company

3D Measurement Accuracy on Underwater Pipeline 3D Imaging Translation mode (test)

199.59Measured value (mm)UW-SLD system
15.572463.3462111.12158.8938Dec 12, 2025

Evaluation results

MethodLinks
UW-SLD systemDirection=Y1t, Ground truth (mm)=2002025.12199.590.410.0021
UW-SLD systemDirection=Y2t, Ground truth (mm)=2002025.12198.971.030.0052
Xu et al.Direction=Y2t, Ground truth (mm)=2002025.12198.861.140.0057
Xu et al.Direction=Y1t, Ground truth (mm)=2002025.12197.692.310.0116
Xu et al.Direction=X3t, Ground truth (mm)=602025.1262.132.130.0355
Xu et al.Direction=X2t, Ground truth (mm)=602025.1261.911.910.0318
Xu et al.Direction=X1t, Ground truth (mm)=602025.1261.491.490.0248
UW-SLD systemDirection=X1t, Ground truth (mm)=602025.1260.180.180.003
UW-SLD systemDirection=X3t, Ground truth (mm)=602025.1259.650.350.0058
UW-SLD systemDirection=X2t, Ground truth (mm)=602025.1259.180.820.0137
UW-SLD systemDirection=Y3t, Ground truth (mm)=502025.1250.560.560.0112
Xu et al.Direction=Y3t, Ground truth (mm)=502025.1248.421.580.0316
Xu et al.Direction=Z3t, Ground truth (mm)=252025.1225.890.890.0356
Xu et al.Direction=Z1t, Ground truth (mm)=252025.1225.770.770.0308
UW-SLD systemDirection=Z1t, Ground truth (mm)=252025.1225.670.670.0268
UW-SLD systemDirection=Z3t, Ground truth (mm)=252025.1225.580.580.0232
UW-SLD systemDirection=Z2t, Ground truth (mm)=252025.1224.540.460.0184
Xu et al.Direction=Z2t, Ground truth (mm)=252025.1222.652.350.094