Homography estimation on Grossmünster Church
0.038Mean ErrorProposed (5pt)
Evaluation Results
| Method | Links | ||
|---|---|---|---|
| Proposed (5pt)Solver Case=Two-sided with independent λ and λ', LOMSAC framework=[34] (min 500 iterations)2025.08 | 0.038 | 150 | |
| Kukelova et al. (5pt)Solver Case=Two-sided with independent λ and λ', LOMSAC framework=[34] (min 500 iterations)2025.08 | 0.039 | 2,657 | |
| Kukelova et al. (6pt)*Solver Case=Two-sided with λ' = λ, LOMSAC framework=[34] (min 500 iterations)2025.08 | 0.039 | 321 | |
| Proposed (4.5pt)Solver Case=Two-sided with λ' = λ, LOMSAC framework=[34] (min 500 iterations)2025.08 | 0.039 | 84 | |
| Kukelova et al. (6pt)Solver Case=Two-sided with independent λ and λ', LOMSAC framework=[34] (min 500 iterations)2025.08 | 0.04 | 330 | |
| Fitzgibbon (5pt)Solver Case=Two-sided with λ' = λ, LOMSAC framework=[34] (min 500 iterations)2025.08 | 0.04 | 233 | |
| Kukelova et al. (5pt)*Solver Case=Two-sided with λ' = λ, LOMSAC framework=[34] (min 500 iterations)2025.08 | 0.04 | 2,053 |