Urban Cable Routing on Case-3
6,911.53Mean Cost (Million CNY)L-MVNS
Evaluation Results
| Method | Links | |||
|---|---|---|---|---|
| L-MVNSNumber of independent runs=10, Neighborhood size=10 per operator (30 total), Maximum iterations=6002025.12 | 6,911.53 | 680.51 | 0 | |
| MVNSNumber of independent runs=10, Neighborhood size=10 per operator (30 total), Maximum iterations=6002025.12 | 7,015.43 | 2,758.93 | 1.5 | |
| SNS-1Number of independent runs=10, Neighborhood size=30, Maximum iterations=6002025.12 | 7,130.63 | 2,000.97 | 3.17 | |
| SNS-2Number of independent runs=10, Neighborhood size=30, Maximum iterations=6002025.12 | 7,253.22 | 3,063.31 | 4.94 | |
| SNS-3Number of independent runs=10, Neighborhood size=30, Maximum iterations=6002025.12 | 7,464.54 | 4,999.3 | 8 | |
| HGSNumber of independent runs=102025.12 | 9,889.6 | 0 | 43.09 | |
| MCWSNumber of independent runs=102025.12 | 13,765.8 | 0 | 99.17 |