Urban Cable Routing on Case-2
5,288.96Mean Cost (million CNY)L-MVNS
Evaluation Results
| Method | Links | |||
|---|---|---|---|---|
| L-MVNSNumber of independent runs=10, Neighborhood size=10 per operator (30 total), Maximum iterations=6002025.12 | 5,288.96 | 1,537.89 | 0 | |
| MVNSNumber of independent runs=10, Neighborhood size=10 per operator (30 total), Maximum iterations=6002025.12 | 5,295.26 | 2,246.12 | 0.12 | |
| SNS-1Number of independent runs=10, Neighborhood size=30, Maximum iterations=6002025.12 | 5,325.11 | 3,494.07 | 0.68 | |
| SNS-2Number of independent runs=10, Neighborhood size=30, Maximum iterations=6002025.12 | 5,527.26 | 1,694.81 | 4.51 | |
| SNS-3Number of independent runs=10, Neighborhood size=30, Maximum iterations=6002025.12 | 5,570.78 | 3,285.46 | 5.33 | |
| HGSNumber of independent runs=102025.12 | 6,716 | 0 | 26.98 | |
| MCWSNumber of independent runs=102025.12 | 8,602.8 | 0 | 62.66 |