Quadrotor Control with Parametric Uncertainty on Case Study 1 Quadrotor with Drag
82.5Total CostProposed (Dual-gatekeeper)
Evaluation Results
| Method | Links | ||
|---|---|---|---|
| Proposed (Dual-gatekeeper)Budget (%)=110.02026.04 | 82.5 | 88 | |
| BaselineBudget (%)=–2026.04 | 100 | 0 |
| Method | Links | ||
|---|---|---|---|
| Proposed (Dual-gatekeeper)Budget (%)=110.02026.04 | 82.5 | 88 | |
| BaselineBudget (%)=–2026.04 | 100 | 0 |