List your company

Mapping Accuracy Evaluation on Sequence 1

0.16Marking APEProposed Method (-)
0.14320.25660.370.4834Jan 27, 2026

Evaluation results

MethodLinks
Proposed Method (-)Point Selection=false, Optimization=none2026.010.160.2
Proposed Method (+PS)Point Selection=true, Optimization=none2026.010.160.06
Proposed Method (+PSR)Point Selection=true, Optimization=PSR2026.010.160.06
Proposed Method (+PPSR)Point Selection=true, Optimization=PPSR2026.010.160.05
PGO-IPM2026.010.240.09
IPM (+PS)Point Selection=true2026.010.240.07
IPM2026.010.580.09