Translation on FLoRes+ En-YY (v. low resource level)
34.6ChrF++OMT-NLLB
Evaluation results
| Method | Links | |
|---|---|---|
| OMT-NLLB2026.03 | 34.6 | |
| OMT-LLaMA 8BParameters=8B2026.03 | 33.8 | |
| NLLB-2002026.03 | 32.5 | |
| MADLAD2026.03 | 29.3 | |
| GPT-OSS 120BParameters=120B2026.03 | 29.2 | |
| TranslateGemma2026.03 | 27.5 | |
| Gemma 32026.03 | 26.4 | |
| LLaMA 3 70BParameters=70B2026.03 | 26.3 | |
| GPT-OSS 20BParameters=20B2026.03 | 24.1 | |
| Hunyuan-MT2026.03 | 23.4 | |
| Tower+2026.03 | 22.9 | |
| EuroLLM2026.03 | 22.3 | |
| Aya Expanse2026.03 | 21.8 | |
| LLaMA 3 8BParameters=8B2026.03 | 20.6 | |
| Aya-1012026.03 | 20.3 | |
| Tiny Aya Global2026.03 | 19.7 |