Translation on FLoRes+ XX-En (low resource level)
54.6ChrF++OMT-NLLB
Evaluation results
| Method | Links | |
|---|---|---|
| OMT-NLLB2026.03 | 54.6 | |
| NLLB-2002026.03 | 50.9 | |
| OMT-LLaMA 8BParameters=8B2026.03 | 50.6 | |
| Gemma 32026.03 | 46.4 | |
| TranslateGemma2026.03 | 45.5 | |
| LLaMA 3 70BParameters=70B2026.03 | 44.8 | |
| MADLAD2026.03 | 43.8 | |
| Tower+2026.03 | 43.1 | |
| GPT-OSS 120BParameters=120B2026.03 | 42.9 | |
| Aya-1012026.03 | 42.1 | |
| GPT-OSS 20BParameters=20B2026.03 | 39.9 | |
| LLaMA 3 8BParameters=8B2026.03 | 38.9 | |
| Hunyuan-MT2026.03 | 35.5 | |
| Tiny Aya Global2026.03 | 34.6 | |
| Aya Expanse2026.03 | 34.5 | |
| EuroLLM2026.03 | 34.2 |