Transfer Gain Prediction and Sign Classification on Ridership
0.77CorrelationETAP
Evaluation Results
| Method | Links | ||
|---|---|---|---|
| ETAPTraining Cost (|Gtrain|)=352026.02 | 0.77 | 85 | |
| Surrogate ModelTraining Cost (|Gtrain|)=352026.02 | 0.67 | 81 |
| Method | Links | ||
|---|---|---|---|
| ETAPTraining Cost (|Gtrain|)=352026.02 | 0.77 | 85 | |
| Surrogate ModelTraining Cost (|Gtrain|)=352026.02 | 0.67 | 81 |