Pathfinding on Studio
98Success Rate (SR)ASA
Evaluation Results
| Method | Links | ||
|---|---|---|---|
| ASAPlanning time limit=100 s2026.07 | 98 | 0.98 | |
| RRT-SE2NMSpace=SE(2) Navigation Mesh, Planning time limit=100 s2026.07 | 97 | 0.29 | |
| RRTPlanning time limit=100 s2026.07 | 97 | 0.29 | |
| PRM-SE2NMSpace=SE(2) Navigation Mesh, Planning time limit=100 s2026.07 | 96 | 0.63 | |
| PRMPlanning time limit=100 s2026.07 | 84 | 0.42 | |
| RRT*-SE2NMSpace=SE(2) Navigation Mesh, Planning time limit=100 s2026.07 | 82 | 0.26 | |
| RRT*Planning time limit=100 s2026.07 | 80 | 0.25 |