Time Series Forecasting on Solar (train)
0.02MSETBP m-bar
Evaluation Results
| Method | Links | ||
|---|---|---|---|
| TBP m-barN=192, burn-in length (m)=191, stateful=false2026.02 | 0.02 | — | |
| TBP m*N=192, burn-in length (m)=141, stateful=false2026.02 | 0.02 | -1 | |
| TBP m-barN=96, burn-in length (m)=95, stateful=false2026.02 | 0.068 | — | |
| TBP m*N=96, burn-in length (m)=75, stateful=false2026.02 | 0.069 | 2 | |
| BPN=48, burn-in length (m)=0, stateful=false2026.02 | 0.152 | — | |
| BPN=96, burn-in length (m)=0, stateful=false2026.02 | 0.152 | — | |
| BPN=192, burn-in length (m)=0, stateful=false2026.02 | 0.152 | — | |
| TBP sfN=192, burn-in length (m)=191, stateful=true2026.02 | 0.185 | — | |
| TBP sfN=96, burn-in length (m)=95, stateful=true2026.02 | 0.203 | — | |
| TBP m-barN=48, burn-in length (m)=47, stateful=false2026.02 | 0.3 | — | |
| TBP m*N=48, burn-in length (m)=31, stateful=false2026.02 | 0.312 | 4 | |
| TBP sfN=48, burn-in length (m)=47, stateful=true2026.02 | 0.312 | — |