Synthetic downstream prediction on Synthetic task bundle (full)
0.81Future NLLOracle-z
Evaluation Results
| Method | Links | ||
|---|---|---|---|
| Oracle-z2026.05 | 0.81 | 0 | |
| RichContext-Posterior-z2026.05 | 0.92 | 0.205 | |
| Posterior-z2026.05 | 1.02 | 0.381 | |
| Point-z2026.05 | 1.18 | 0.46 | |
| Direct-Large2026.05 | 1.2 | 0.598 | |
| Direct-Dist2026.05 | 1.22 | 0.732 | |
| Direct-MTL2026.05 | 1.24 | 0.498 | |
| Direct-Point2026.05 | 1.48 | 1 |