Survey estimation on CCES 2024
17.1MSE Reduction (%)PPI + Opt. (Oracle)
Evaluation Results
| Method | Links | ||||||
|---|---|---|---|---|---|---|---|
| PPI + Opt. (Oracle)Budget (B)=5,000, MC draws=2,0002026.04 | 17.1 | 9 | 9.1 | 18.1 | 20.7 | 100 | |
| PPI + Opt. (Pred.)Budget (B)=5,000, MC draws=2,0002026.04 | 10.5 | 5.4 | 7.7 | 11.5 | 11.7 | 61.3 | |
| PPI + UniformBudget (B)=5,000, MC draws=2,0002026.04 | 1.5 | 0.8 | 0.7 | 1.6 | 1.5 | 8.8 |