Spatiotemporal Prediction on Spinodal Decomposition (Timing Metrics)
80.75Training TimeSimVPv2
Evaluation Results
| Method | Links | ||
|---|---|---|---|
| SimVPv2Epochs=200, Batch size=12026.06 | 80.75 | 2 | |
| The Proposed ModelEpochs=200, Batch size=12026.06 | 97.12 | 2 | |
| E3D-LSTMEpochs=200, Batch size=12026.06 | 461.88 | 51.6 |