Solar energy generation evaluation on 3DPV Performance Simulation v1 (test)
209.6Peak Power (mW)Cavity Fin
Evaluation Results
| Method | Links | ||
|---|---|---|---|
| Cavity FinConstraint=5× structural equivalent2026.05 | 209.6 | 2,330.5 | |
| Tilted WaffleConstraint=50-cell, 20× cap2026.05 | 205.9 | 2,314.1 | |
| Open CubeConstraint=5× structural equivalent2026.05 | 198.8 | 2,265.3 | |
| Candidate 188Constraint=3× active capacity2026.05 | 175.6 | 2,011.8 | |
| Candidate 85Constraint=3× active capacity2026.05 | 168.5 | 1,837.8 | |
| Baseline Flat PanelConstraint=1× base limit2026.05 | 122.7 | 1,012.3 |