Simulation-Based Inference on SBIBM Gaussian Linear (test)
50.7C2ST AccuracyFlux1Joint
Evaluation Results
| Method | Links | |
|---|---|---|
| Flux1JointArchitecture=Flux1Joint, Training Objective=flow matching, EMA=true, Simulation Budget=10^6, Test Observations=102026.05 | 50.7 |