Shift Estimation on Sparse Joint Shift
0Estimation Inaccuracy (0.159, 0.167)EPA
Evaluation Results
| Method | Links | ||||||
|---|---|---|---|---|---|---|---|
| EPAModel Architecture=Linear Models2026.05 | 0 | 0 | 0 | 0.1 | 1 | 0 | |
| EPA2026.05 | 3.1 | 3.4 | 3.4 | 6.4 | 1 | 0 | |
| SEES-C2026.05 | 5.7 | 2.9 | 12.7 | 22.2 | 0.976 | 0 | |
| SEES-D2026.05 | 8.4 | 4.8 | 14.1 | 23.5 | 0.976 | 0 | |
| COV-CLF2026.05 | 12.8 | 9.8 | 20.3 | 24.9 | 0.935 | 0 | |
| KMM2026.05 | 17.2 | 13 | 22.7 | 31 | 0.442 | 0 | |
| COV-CLFModel Architecture=Linear Models2026.05 | 17.5 | 18.3 | 16.9 | 16 | 0.045 | 0 | |
| SEES-CModel Architecture=Linear Models2026.05 | 22.2 | 24.2 | 21.6 | 21 | 0.027 | 0 | |
| SEES-DModel Architecture=Linear Models2026.05 | 23.5 | 24 | 22.5 | 24.1 | 0.12 | 0 |