Scheduling (MILP) on Real-world scheduling dataset (test)
973,354.92TimePS+MILP-StuDio
Evaluation Results
| Method | Links | |||
|---|---|---|---|---|
| PS+MILP-StuDioData generation method=MILP-StuDio2024.10 | 973,354.92 | 112.86 | 5,462.42 | |
| PS+G2MILPData generation method=G2MILP2024.10 | 978,836.5 | 115.02 | 5,528.42 | |
| PSData generation method=None (Base)2024.10 | 984,113.66 | 125.35 | 7,694.25 |