Resource Scheduling on 60-day window (test)
1Convergence IterationsGreedy (cost-only)
Evaluation Results
| Method | Links | |||
|---|---|---|---|---|
| Greedy (cost-only)2026.05 | 1 | 0 | 0 | |
| SB Solver2026.05 | 5 | 14.3 | 0 | |
| Simulated Annealing2026.05 | 40 | 8.2 | 0 |
| Method | Links | |||
|---|---|---|---|---|
| Greedy (cost-only)2026.05 | 1 | 0 | 0 | |
| SB Solver2026.05 | 5 | 14.3 | 0 | |
| Simulated Annealing2026.05 | 40 | 8.2 | 0 |