Reconstruction on SRN Cars (train)
27.67PSNRLatent Posterior Sampling
Evaluation Results
| Method | Links | |
|---|---|---|
| Latent Posterior Samplinglatent dim=10242026.05 | 27.67 | |
| functalatent dim=10242026.05 | 24.4 |
| Method | Links | |
|---|---|---|
| Latent Posterior Samplinglatent dim=10242026.05 | 27.67 | |
| functalatent dim=10242026.05 | 24.4 |