Probabilistic Time Series Forecasting on SAR-Param H=64
0.343CRPSFern
Evaluation Results
| Method | Links | |
|---|---|---|
| Fern2026.03 | 0.343 | |
| TimesFM-2.5-200M-PyTorch2026.03 | 0.363 | |
| Chronos-22026.03 | 0.38 | |
| Chronos-Bolt-Small2026.03 | 0.387 | |
| Chronos-Bolt-Base2026.03 | 0.404 |
| Method | Links | |
|---|---|---|
| Fern2026.03 | 0.343 | |
| TimesFM-2.5-200M-PyTorch2026.03 | 0.363 | |
| Chronos-22026.03 | 0.38 | |
| Chronos-Bolt-Small2026.03 | 0.387 | |
| Chronos-Bolt-Base2026.03 | 0.404 |