Preprocessing on CFD Simulation Data (N=10^6)
0.94Preprocessing Time (s)M3
Evaluation Results
| Method | Links | |
|---|---|---|
| M32026.05 | 0.94 | |
| Grid-based2026.05 | 1.67 | |
| Random2026.05 | 3.3 | |
| Proxy-based2026.05 | 4.92 | |
| Neighborhood-based2026.05 | 426 |
| Method | Links | |
|---|---|---|
| M32026.05 | 0.94 | |
| Grid-based2026.05 | 1.67 | |
| Random2026.05 | 3.3 | |
| Proxy-based2026.05 | 4.92 | |
| Neighborhood-based2026.05 | 426 |