Prediction Interval estimation on concrete (test)
91.12PICPTUBE
Evaluation Results
| Method | Links | ||
|---|---|---|---|
| TUBETarget coverage (1 - alpha)=0.90, Number of runs=102024.12 | 91.12 | 0.46 | |
| QD lossTarget coverage (1 - alpha)=0.90, Number of runs=102024.12 | 89.37 | 1.28 | |
| RQR-WTarget coverage (1 - alpha)=0.90, Number of runs=102024.12 | 88.74 | 0.47 | |
| QRTarget coverage (1 - alpha)=0.90, Number of runs=102024.12 | 87.77 | 0.44 | |
| SQR-CTarget coverage (1 - alpha)=0.90, Number of runs=102024.12 | 86.02 | 1.39 | |
| SQR-NTarget coverage (1 - alpha)=0.90, Number of runs=102024.12 | 85.29 | 1.33 |