Prediction Interval Computation on Concrete tabular c=0
46.65Throughput (trials/s)CQR
Evaluation Results
| Method | Links | |
|---|---|---|
| CQRn_cal=50, trials=3002026.07 | 46.65 | |
| LOCALn_cal=50, trials=3002026.07 | 45.74 | |
| NNGn_cal=50, trials=3002026.07 | 12.79 | |
| DTOn_cal=50, trials=3002026.07 | 5.62 | |
| RoBAS-EBn_cal=50, trials=3002026.07 | 5.35 | |
| DTAn_cal=50, trials=3002026.07 | 5.25 | |
| RoBAS-Fulln_cal=50, trials=3002026.07 | 4.87 | |
| CBn_cal=50, trials=3002026.07 | 2.62 | |
| CBMAn_cal=50, trials=3002026.07 | 2.62 |