Post-shift accepted-trajectory risk estimation on Public SQuAD-derived RAG
0Post-shift Accepted Trajectory RiskFixed trajectory
Evaluation Results
| Method | Links | |
|---|---|---|
| Fixed trajectoryCalibration Strategy=Fixed trajectory2026.06 | 0 | |
| ToolChain-CRCCalibration Strategy=Trajectory calibration2026.06 | 0 | |
| Prompt/retrieval-onlyCalibration Strategy=Prompt/retrieval-only2026.06 | 0.001 | |
| Final-onlyCalibration Strategy=Final-answer-only2026.06 | 0.317 |