Post-blackout Forecasting on Seattle Inductive Loop Detector 2015 (val)
4.313RMSE (1-step, mph)MNAR (LDS)
Evaluation Results
| Method | Links | |||
|---|---|---|---|---|
| MNAR (LDS)K=20, EM iterations=20 (10 warm-start + 10 MNAR updated)2026.01 | 4.313 | 4.228 | 5.104 | |
| MAR (LDS)K=20, EM iterations=102026.01 | 4.391 | 4.349 | 5.16 | |
| LOCF2026.01 | 7.86 | 8.465 | 8.942 | |
| LinearInterp + SeasonalNaive2026.01 | 8.734 | 8.442 | 8.881 |