Physics-informed adaptation on 1D Burgers Equation BC adapt
1.84Full PDE MSEFT adapt (at tsub)
Evaluation Results
| Method | Links | ||||
|---|---|---|---|---|---|
| FT adapt (at tsub)Time (s)=72.302026.06 | 1.84 | — | 3.76 | 3.78 | |
| Full FT (at end)Time (s)=1439.482026.06 | 6.42 | — | 6.57 | 1.46 | |
| Full FT (at tsub)Time (s)=72.302026.06 | 7.15 | — | 1.19 | 3.29 | |
| Subspace proj.Time (s)=72.302026.06 | 7.43 | 5.1 | 3 | 4.42 | |
| FT adapt (at end)Time (s)=1008.182026.06 | 8.32 | — | 1.65 | 2.51 |