PDE Solving on Wave PDE
0.001Relative L2 ErrorSAFE-NET
Evaluation Results
| Method | Links | ||
|---|---|---|---|
| SAFE-NETOptimization Schedule=(2)2025.02 | 0.001 | — | |
| RBA-PINNOptimization Schedule=(2)2025.02 | 0.0019 | — | |
| RFFOptimization Schedule=(2)2025.02 | 0.0077 | — | |
| W-PINNOptimization Schedule=(2)2025.02 | 0.0092 | — | |
| RBF-POptimization Schedule=(2)2025.02 | 0.0093 | — | |
| RBFOptimization Schedule=(2)2025.02 | 0.0267 | — | |
| FLS-PINNOptimization Schedule=(2)2025.02 | 0.0412 | — | |
| PINNOptimization Schedule=(2)2025.02 | 0.0689 | — | |
| DSGNARPrecision=Double, Params=11,225, Sketch s=4,0002026.07 | 1.2 | 635.4 | |
| DSGNARPrecision=Single, Params=5,085, Sketch s=2,0002026.07 | 5.41 | 70.1 | |
| Dai+26Precision=Double, Params=11,225, Sketch s=4,0002026.07 | 6.71 | 2,772 |