PDE Solving on POSEIDON NS-PwC (test)
1.09Final-time Relative L1 ErrorDRIFT-NET
Evaluation Results
| Method | Links | |
|---|---|---|
| DRIFT-NETRollout=Closed-loop, Target Time=T*2025.09 | 1.09 | |
| U-NORollout=Closed-loop, Target Time=T*2025.09 | 1.62 | |
| Refiner U-NetRollout=Closed-loop, Target Time=T*2025.09 | 1.95 | |
| U-Net-ConvNeXtRollout=Closed-loop, Target Time=T*2025.09 | 2.22 | |
| scOTRollout=Closed-loop, Target Time=T*2025.09 | 2.35 | |
| FNORollout=Closed-loop, Target Time=T*2025.09 | 4.57 |