Optimization on Electromagnetic scattering
42Success RateMM-FBO
Evaluation Results
| Method | Links | ||
|---|---|---|---|
| MM-FBOThreshold (epsilon)=0.10, Budget (m)=502025.11 | 42 | 40 | |
| MM-FBOThreshold (epsilon)=0.05, Budget (m)=502025.11 | 14 | 36 | |
| GP on gThreshold (epsilon)=0.10, Budget (m)=502025.11 | 8 | 41 | |
| GP on gThreshold (epsilon)=0.05, Budget (m)=502025.11 | 2 | 42 | |
| SFDThreshold (epsilon)=0.10, Budget (m)=502025.11 | 0 | — | |
| SFDThreshold (epsilon)=0.05, Budget (m)=502025.11 | 0 | — |