Multivariate time series forecasting on ILI Multivariate (test)
1.587MSEPathformer
Evaluation Results
| Method | Links | ||
|---|---|---|---|
| PathformerInput Length (H)=36, Prediction Length (T)=242024.02 | 1.587 | 0.758 | |
| PatchTSTInput Length (H)=36, Prediction Length (T)=242024.02 | 1.724 | 0.843 |