Model Predictive Control on Real-world energy dataset 10 buildings configuration
475Cost (EUR)Centralised
Evaluation Results
| Method | Links | |||
|---|---|---|---|---|
| CentralisedNumber of buildings=10, Prediction horizon=2-hour, Maximum coalition size=6, Full horizon=1 day2026.03 | 475 | 14,986 | 50,700 | |
| Bottom-UpNumber of buildings=10, Prediction horizon=2-hour, Maximum coalition size=6, Full horizon=1 day2026.03 | 478 | 18,652 | 63,432 | |
| Limited InformationNumber of buildings=10, Prediction horizon=2-hour, Maximum coalition size=6, Full horizon=1 day2026.03 | 489 | 1,362 | 4,067 | |
| DecentralisedNumber of buildings=10, Prediction horizon=2-hour, Maximum coalition size=6, Full horizon=1 day2026.03 | 496 | — | 17 |