Mesh Reconstruction on ABC multi (test)
2.18CDUniCo
Evaluation Results
| Method | Links | ||||
|---|---|---|---|---|---|
| UniCoProcedure=completion then reconstruction (C→R)2026.01 | 2.18 | 7.53 | 0.935 | 1.49 | |
| Point2CADProcedure=completion then reconstruction (C→R)2026.01 | 3.39 | 11.96 | 0.833 | 0.66 | |
| PrimFitProcedure=direct reconstruction (R)2026.01 | 7.8 | 25.17 | 0.788 | 15.96 | |
| BSP-NetProcedure=direct reconstruction (R)2026.01 | 8.35 | 16.73 | 0.74 | 20.52 | |
| Point2CADProcedure=direct reconstruction (R)2026.01 | 8.69 | 30.66 | 0.779 | 15.91 |