MDP Planning under Reward Misspecification on Four Rooms
111.53Time (msecs)IRD
Evaluation Results
| Method | Links | ||||
|---|---|---|---|---|---|
| IRDGrid size=(7,7)2024.04 | 111.53 | — | — | — | |
| IRDGrid size=(5,5)2024.04 | 491.7 | — | — | — | |
| IRDGrid size=(9,9)2024.04 | 2,513.5 | — | — | — | |
| IRDGrid size=(12,12)2024.04 | 7,285.22 | — | — | 10.57 | |
| Expectation AlignmentGrid size=(5,5)2024.04 | — | — | 3.11 | — |