Life-of-mine scheduling optimization on Copper-gold mining complex Base Case alpha = 1.00
221.8Expected NPV (M$)One-shot SA
Evaluation Results
| Method | Links | |||
|---|---|---|---|---|
| One-shot SAalpha=1.00, realizations=992026.05 | 221.8 | 181.3 | 22.3 | |
| SA-POMDPalpha=1.00, realizations=99, Update Method=ES-MDA2026.05 | 198.5 | 189.7 | 4.6 |