Job Shop Scheduling Problem on Taillard 50 x 15
0Optimality Gap (%)OR-Tools
Evaluation Results
| Method | Links | ||
|---|---|---|---|
| OR-ToolsExecution time=1800s per instance2026.03 | 0 | — | |
| CP-SAT2026.05 | 0 | — | |
| ProRL2026.05 | 5.81 | — | |
| PPOPDR2026.05 | 13.95 | — | |
| RL-GNNCategory=DRL-based2026.03 | 15.9 | — | |
| ReSchedCategory=DRL-based, Training size=10 x 102026.03 | 16.1 | — | |
| MWR2026.05 | 16.86 | — | |
| MOR2026.05 | 17.37 | — | |
| Random2026.05 | 20.33 | — | |
| L2DCategory=DRL-based2026.03 | 22.4 | — | |
| SPT2026.05 | 24.11 | — | |
| MOPNRCategory=PDRs2026.03 | 30.1 | — | |
| FIFO2026.05 | 33.05 | — | |
| FDD/MWKRCategory=PDRs2026.03 | 34.8 | — | |
| LOR2026.05 | 35.56 | — | |
| MWKRCategory=PDRs2026.03 | 40.9 | — | |
| SPTCategory=PDRs2026.03 | 51.4 | — | |
| UBDescription=Best-known solution2026.03 | — | 2,783.8 |