Job Shop Scheduling Problem on Taillard 30 x 20
2.8Gap (%)OR-Tools
Evaluation Results
| Method | Links | ||
|---|---|---|---|
| OR-ToolsExecution time=1800s per instance2026.03 | 2.8 | — | |
| ReSchedCategory=DRL-based, Training size=10 x 102026.03 | 22.5 | — | |
| RL-GNNCategory=DRL-based2026.03 | 32 | — | |
| L2DCategory=DRL-based2026.03 | 33.6 | — | |
| MOPNRCategory=PDRs2026.03 | 48.2 | — | |
| FDD/MWKRCategory=PDRs2026.03 | 56.3 | — | |
| MWKRCategory=PDRs2026.03 | 63.9 | — | |
| SPTCategory=PDRs2026.03 | 66 | — | |
| UBDescription=Best-known solution2026.03 | — | 1,919.4 |