Job Shop Scheduling Problem on Taillard 100 x 20
3.9Optimality Gap (%)OR-Tools
Evaluation Results
| Method | Links | ||
|---|---|---|---|
| OR-ToolsExecution time=1800s per instance2026.03 | 3.9 | — | |
| RL-GNNCategory=DRL-based2026.03 | 9.2 | — | |
| ReSchedCategory=DRL-based, Training size=10 x 102026.03 | 9.6 | — | |
| L2DCategory=DRL-based2026.03 | 13.6 | — | |
| MOPNRCategory=PDRs2026.03 | 20.2 | — | |
| FDD/MWKRCategory=PDRs2026.03 | 23.4 | — | |
| MWKRCategory=PDRs2026.03 | 32.9 | — | |
| SPTCategory=PDRs2026.03 | 41 | — | |
| UBDescription=Best-known solution2026.03 | — | 5,369.6 |