Image Classification on EUROSAT (Robust Accuracy)
12Robust AccuracyHPT-GPD
Evaluation Results
| Method | Links | |
|---|---|---|
| HPT-GPDEvaluation Protocol=Zero-shot, Attack Strategy=AutoAttack, Perturbation Budget=1/2552026.01 | 12 | |
| PMGEvaluation Protocol=Zero-shot, Attack Strategy=AutoAttack, Perturbation Budget=1/2552026.01 | 3 | |
| CLIPEvaluation Protocol=Zero-shot, Attack Strategy=AutoAttack, Perturbation Budget=1/2552026.01 | 0 |