Flow Shop Scheduling Problem on FSSP (N500m20)
2.81Optimality Gap (%)GA-2opt+ReEvo+AutoEP
Evaluation Results
| Method | Links | ||
|---|---|---|---|
| GA-2opt+ReEvo+AutoEP2025.09 | 2.81 | 181.6 | |
| GA-2opt+AutoEP2025.09 | 2.83 | 181.5 | |
| GA-2opt+EoH+AutoEP2025.09 | 2.85 | 181.8 | |
| GA-2opt+GLEET2025.09 | 3.52 | 180.2 | |
| GA-2opt+ReEvo2025.09 | 3.74 | 178.8 | |
| GA-2opt+BEA2025.09 | 3.81 | 179.3 | |
| GA-2opt+PT2025.09 | 4.09 | 178.5 | |
| GA-2opt+EoH2025.09 | 4.22 | 178.3 | |
| NEH2025.09 | 4.59 | 4.7 | |
| NEHFF2025.09 | 4.83 | 4.9 | |
| PFSPNet2025.09 | 5.36 | 5 | |
| GA-2opt2025.09 | 7.83 | 178 |