Flow Shop Scheduling Problem on FSSP n20m10
2.08Optimality Gap (%)GA-2opt+EoH+AutoEP
Evaluation Results
| Method | Links | ||
|---|---|---|---|
| GA-2opt+EoH+AutoEP2025.09 | 2.08 | 6.5 | |
| GA-2opt+ReEvo+AutoEP2025.09 | 2.08 | 6.4 | |
| GA-2opt+AutoEP2025.09 | 2.09 | 6.3 | |
| GA-2opt+GLEET2025.09 | 2.64 | 4.1 | |
| GA-2opt+ReEvo2025.09 | 2.85 | 4 | |
| GA-2opt+BEA2025.09 | 2.91 | 4.5 | |
| GA-2opt+PT2025.09 | 3.16 | 3.9 | |
| GA-2opt+EoH2025.09 | 3.31 | 3.7 | |
| PFSPNet2025.09 | 4.04 | 0.6 | |
| NEH2025.09 | 4.05 | 0.4 | |
| NEHFF2025.09 | 4.15 | 0.5 | |
| GA-2opt2025.09 | 4.37 | 3.6 |