Flow Shop Scheduling Problem on FSSP N200m20
2.93Optimality Gap (%)GA-2opt+AutoEP
Evaluation Results
| Method | Links | ||
|---|---|---|---|
| GA-2opt+AutoEP2025.09 | 2.93 | 63.2 | |
| GA-2opt+ReEvo+AutoEP2025.09 | 2.93 | 63.3 | |
| GA-2opt+EoH+AutoEP2025.09 | 2.96 | 63.5 | |
| GA-2opt+GLEET2025.09 | 3.28 | 62.3 | |
| GA-2opt+ReEvo2025.09 | 3.31 | 60.7 | |
| GA-2opt+BEA2025.09 | 3.53 | 61.2 | |
| GA-2opt+EoH2025.09 | 3.64 | 60.2 | |
| GA-2opt+PT2025.09 | 3.93 | 60.4 | |
| NEH2025.09 | 5.27 | 3.8 | |
| GA-2opt2025.09 | 5.62 | 60 | |
| NEHFF2025.09 | 5.82 | 4 | |
| PFSPNet2025.09 | 6.05 | 4.2 |