Flow Shop Scheduling Problem on FSSP (N100m20)
3.14Optimality Gap (%)GA-2opt+ReEvo+AutoEP
Evaluation Results
| Method | Links | ||
|---|---|---|---|
| GA-2opt+ReEvo+AutoEP2025.09 | 3.14 | 34.7 | |
| GA-2opt+AutoEP2025.09 | 3.16 | 34.6 | |
| GA-2opt+EoH+AutoEP2025.09 | 3.16 | 34.9 | |
| PFSPNet2025.09 | 3.56 | 2.2 | |
| NEH2025.09 | 3.58 | 1.8 | |
| GA-2opt+GLEET2025.09 | 3.67 | 33.8 | |
| NEHFF2025.09 | 3.73 | 2 | |
| GA-2opt+ReEvo2025.09 | 3.88 | 32.2 | |
| GA-2opt+BEA2025.09 | 3.95 | 32.6 | |
| GA-2opt+PT2025.09 | 4.19 | 32 | |
| GA-2opt+EoH2025.09 | 4.43 | 31.8 | |
| GA-2opt2025.09 | 6.42 | 31.5 |