Flexible Job Shop Scheduling Problem on Randomly generated FJSP 50 x 15
881.45Objective Value (Makespan)OR-Tools
Evaluation Results
| Method | Links | |||
|---|---|---|---|---|
| OR-ToolsLower Bound (LB)=537.2, Time Limit=60.0 min2026.03 | 881.45 | 60 | 39.05 | |
| MIStar-200Lower Bound (LB)=537.2, Iterations=200, Training Instance Size=20 x 152026.03 | 969.7 | 10.6 | 44.6 |