List your company

Energy system operating cost optimization on Pilot Energy System (yearly statistics over 4 runs)

60,284Mean Cost ($)IDAES
58,796.0868,839.5478,88388,926.46Apr 1, 2026

Evaluation results

MethodLinks
IDAESSingle run=true2026.0460,284—————
MLRF2-MRwsuncertainty scaling parameter (κ)=2, model=Random Forest2026.0473,05473,25072,03973,6776590.91
MLGB-MRwsmodel=Gradient Boosting (GB)2026.0473,18873,10971,77874,7581,0751.47
MLRF1-MRwsuncertainty scaling parameter (κ)=1, model=Random Forest2026.0473,80774,02472,66074,5206950.95
MRwstype=Rule-based/Baseline2026.0474,15773,84572,72376,2161,2751.72
Rule-basedSingle run=true2026.0480,194—————
HRdescription=Manual control2026.0497,48297,49897,01997,9133170.33