Electric Vehicle Routing Problem with Time Windows on EVRPTW unseen N=40 (test)
74.7Success RateCB-DRL
Evaluation Results
| Method | Links | ||
|---|---|---|---|
| CB-DRL2026.01 | 74.7 | 20.64 | |
| Standard PPO2026.01 | 66.2 | 23.86 |
| Method | Links | ||
|---|---|---|---|
| CB-DRL2026.01 | 74.7 | 20.64 | |
| Standard PPO2026.01 | 66.2 | 23.86 |