Confidence Interval Construction on Synthetic Dataset #2 (d=4, n=256)
9895% CI CRPNC-enhanced batching
Evaluation Results
| Method | Links | |||||
|---|---|---|---|---|---|---|
| PNC-enhanced batching2023.06 | 98 | 0.0088 | 92 | 0.0065 | 0.0401 | |
| PNC-enhanced cheap bootstrap2023.06 | 98 | 0.0346 | 94 | 0.0266 | 0.0374 | |
| DropoutUQ2023.06 | 98 | 0.0344 | 94 | 0.0282 | 0.0426 |