Confidence interval construction on Boston (test 1, 2, 3, 4, 5)
10095% CI Coverage RatePNC-enhanced batching
Evaluation Results
| Method | Links | |||||
|---|---|---|---|---|---|---|
| PNC-enhanced batchingJ=402023.06 | 100 | 1.172 | 97.5 | 0.866 | 48.6 | |
| PNC-enhanced cheap bootstrapJ=402023.06 | 92.5 | 1.024 | 87.5 | 0.786 | 33.3 | |
| DropoutUQJ=402023.06 | 85 | 0.997 | 70 | 0.832 | 10.9 |