# Translation on FLoRes+ En-YY (low resource level)

Source: [Translation on FLoRes+ En-YY (low resource level)](<https://www.sota2.com/research/sota/translation-on-flores-plus-en-yy-low-resource-level>)

Collection index: [llms.txt](<https://www.sota2.com/research/llms.txt>)

Data updated: 2026-03-18T08:34:26.730Z

Evaluation of Machine Translation performance for the En-YY language pair using the low resource level subset of the FLoRes+ dataset, measured by ChrF++.

A research result applies to its stated dataset, split, metric and evaluation configuration. Compare like-for-like settings, preserve the metric's unit and direction, and distinguish paper-reported results from independent reproduction. The best result recorded here is not a claim of exhaustive, current global coverage.

| Scope | Recorded value |
| --- | --- |
| Task | Translation |
| Dataset (including any stated split) | FLoRes+ En-YY, low resource level |
| Metric | ChrF++ |
| Unit | PERCENT |
| Direction | Higher is better |
| Results loaded | 16 of 16 |
| Coverage | All results currently returned for this benchmark |

Evaluation settings may differ between results. The original papers and recorded configurations are needed to establish comparability. A shared metric name alone does not establish an identical protocol.

## Metrics

- [ChrF++](<https://www.sota2.com/research/sota/translation-on-flores-plus-en-yy-low-resource-level.md?metric=ChrF%2B%2B>): Higher is better; unit: PERCENT.

## Recorded results

| Method | ChrF++ | Result date | Report paper |
| --- | --- | --- | --- |
| OMT-NLLB | 41 | Not recorded | 69ba31840636e5bf4afc076d |
| OMT-LLaMA 8B | 39.8 | Not recorded | 69ba31840636e5bf4afc076d |
| NLLB-200 | 39.4 | Not recorded | 69ba31840636e5bf4afc076d |
| GPT-OSS 120B | 31.7 | Not recorded | 69ba31840636e5bf4afc076d |
| Gemma 3 | 31.5 | Not recorded | 69ba31840636e5bf4afc076d |
| MADLAD | 31.4 | Not recorded | 69ba31840636e5bf4afc076d |
| LLaMA 3 70B | 31.1 | Not recorded | 69ba31840636e5bf4afc076d |
| TranslateGemma | 30.5 | Not recorded | 69ba31840636e5bf4afc076d |
| GPT-OSS 20B | 25 | Not recorded | 69ba31840636e5bf4afc076d |
| Aya-101 | 22.9 | Not recorded | 69ba31840636e5bf4afc076d |
| Tower+ | 22.6 | Not recorded | 69ba31840636e5bf4afc076d |
| LLaMA 3 8B | 21.7 | Not recorded | 69ba31840636e5bf4afc076d |
| Hunyuan-MT | 20.5 | Not recorded | 69ba31840636e5bf4afc076d |
| Aya Expanse | 20.1 | Not recorded | 69ba31840636e5bf4afc076d |
| Tiny Aya Global | 19.5 | Not recorded | 69ba31840636e5bf4afc076d |
| EuroLLM | 18.8 | Not recorded | 69ba31840636e5bf4afc076d |

### OMT-NLLB

ChrF++: 41. Result ID: 69ba637447f34ce924a44c12.

[Reporting paper](<https://www.sota2.com/research/paper/69ba31840636e5bf4afc076d.md>)

[Method origin paper](<https://www.sota2.com/research/paper/69ba31840636e5bf4afc076d.md>)

Recorded evaluation configuration: Not recorded. This record does not assert independent reproduction.

### OMT-LLaMA 8B

ChrF++: 39.8. Result ID: 69ba637447f34ce924a44c13.

[Reporting paper](<https://www.sota2.com/research/paper/69ba31840636e5bf4afc076d.md>)

[Method origin paper](<https://www.sota2.com/research/paper/69ba31840636e5bf4afc076d.md>)

Recorded evaluation configuration: {"Parameters":"8B"}. This record does not assert independent reproduction.

### NLLB-200

ChrF++: 39.4. Result ID: 69ba637447f34ce924a44c14.

[Reporting paper](<https://www.sota2.com/research/paper/69ba31840636e5bf4afc076d.md>)

Recorded evaluation configuration: Not recorded. This record does not assert independent reproduction.

### GPT-OSS 120B

ChrF++: 31.7. Result ID: 69ba637447f34ce924a44c17.

[Reporting paper](<https://www.sota2.com/research/paper/69ba31840636e5bf4afc076d.md>)

Recorded evaluation configuration: {"Parameters":"120B"}. This record does not assert independent reproduction.

### Gemma 3

ChrF++: 31.5. Result ID: 69ba637447f34ce924a44c15.

[Reporting paper](<https://www.sota2.com/research/paper/69ba31840636e5bf4afc076d.md>)

Recorded evaluation configuration: Not recorded. This record does not assert independent reproduction.

### MADLAD

ChrF++: 31.4. Result ID: 69ba637447f34ce924a44c19.

[Reporting paper](<https://www.sota2.com/research/paper/69ba31840636e5bf4afc076d.md>)

[Method origin paper](<https://www.sota2.com/research/paper/68fa70921e209131cea4bece.md>)

Recorded evaluation configuration: Not recorded. This record does not assert independent reproduction.

### LLaMA 3 70B

ChrF++: 31.1. Result ID: 69ba637447f34ce924a44c18.

[Reporting paper](<https://www.sota2.com/research/paper/69ba31840636e5bf4afc076d.md>)

Recorded evaluation configuration: {"Parameters":"70B"}. This record does not assert independent reproduction.

### TranslateGemma

ChrF++: 30.5. Result ID: 69ba637447f34ce924a44c16.

[Reporting paper](<https://www.sota2.com/research/paper/69ba31840636e5bf4afc076d.md>)

Recorded evaluation configuration: Not recorded. This record does not assert independent reproduction.

### GPT-OSS 20B

ChrF++: 25. Result ID: 69ba637447f34ce924a44c1a.

[Reporting paper](<https://www.sota2.com/research/paper/69ba31840636e5bf4afc076d.md>)

Recorded evaluation configuration: {"Parameters":"20B"}. This record does not assert independent reproduction.

### Aya-101

ChrF++: 22.9. Result ID: 69ba637447f34ce924a44c1b.

[Reporting paper](<https://www.sota2.com/research/paper/69ba31840636e5bf4afc076d.md>)

Recorded evaluation configuration: Not recorded. This record does not assert independent reproduction.

### Tower+

ChrF++: 22.6. Result ID: 69ba637447f34ce924a44c1c.

[Reporting paper](<https://www.sota2.com/research/paper/69ba31840636e5bf4afc076d.md>)

[Method origin paper](<https://www.sota2.com/research/paper/68fa72531e209131cea55a2f.md>)

Recorded evaluation configuration: Not recorded. This record does not assert independent reproduction.

### LLaMA 3 8B

ChrF++: 21.7. Result ID: 69ba637447f34ce924a44c1d.

[Reporting paper](<https://www.sota2.com/research/paper/69ba31840636e5bf4afc076d.md>)

Recorded evaluation configuration: {"Parameters":"8B"}. This record does not assert independent reproduction.

### Hunyuan-MT

ChrF++: 20.5. Result ID: 69ba637447f34ce924a44c1f.

[Reporting paper](<https://www.sota2.com/research/paper/69ba31840636e5bf4afc076d.md>)

Recorded evaluation configuration: Not recorded. This record does not assert independent reproduction.

### Aya Expanse

ChrF++: 20.1. Result ID: 69ba637447f34ce924a44c20.

[Reporting paper](<https://www.sota2.com/research/paper/69ba31840636e5bf4afc076d.md>)

Recorded evaluation configuration: Not recorded. This record does not assert independent reproduction.

### Tiny Aya Global

ChrF++: 19.5. Result ID: 69ba637447f34ce924a44c1e.

[Reporting paper](<https://www.sota2.com/research/paper/69ba31840636e5bf4afc076d.md>)

[Method origin paper](<https://www.sota2.com/research/paper/69b399ef0636e5bf4afbc93b.md>)

Recorded evaluation configuration: Not recorded. This record does not assert independent reproduction.

### EuroLLM

ChrF++: 18.8. Result ID: 69ba637447f34ce924a44c21.

[Reporting paper](<https://www.sota2.com/research/paper/69ba31840636e5bf4afc076d.md>)

Recorded evaluation configuration: Not recorded. This record does not assert independent reproduction.

Page 1 of 1. This is an index page, not the full collection.
