# Translation on FLoRes+ En-YY (high resource level)

Source: [Translation on FLoRes+ En-YY (high resource level)](<https://www.sota2.com/research/sota/translation-on-flores-plus-en-yy-high-resource-level>)

Collection index: [llms.txt](<https://www.sota2.com/research/llms.txt>)

Data updated: 2026-03-18T08:34:26.623Z

Evaluation of Machine Translation performance for the En-YY language pair using the high resource level subset of the FLoRes+ dataset, measured by ChrF++.

A research result applies to its stated dataset, split, metric and evaluation configuration. Compare like-for-like settings, preserve the metric's unit and direction, and distinguish paper-reported results from independent reproduction. The best result recorded here is not a claim of exhaustive, current global coverage.

| Scope | Recorded value |
| --- | --- |
| Task | Translation |
| Dataset (including any stated split) | FLoRes+ En-YY, high resource level |
| Metric | ChrF++ |
| Unit | PERCENT |
| Direction | Higher is better |
| Results loaded | 16 of 16 |
| Coverage | All results currently returned for this benchmark |

Evaluation settings may differ between results. The original papers and recorded configurations are needed to establish comparability. A shared metric name alone does not establish an identical protocol.

## Metrics

- [ChrF++](<https://www.sota2.com/research/sota/translation-on-flores-plus-en-yy-high-resource-level.md?metric=ChrF%2B%2B>): Higher is better; unit: PERCENT.

## Recorded results

| Method | ChrF++ | Result date | Report paper |
| --- | --- | --- | --- |
| Gemma 3 | 58.6 | Not recorded | 69ba31840636e5bf4afc076d |
| GPT-OSS 120B | 58.2 | Not recorded | 69ba31840636e5bf4afc076d |
| OMT-NLLB | 57.6 | Not recorded | 69ba31840636e5bf4afc076d |
| OMT-LLaMA 8B | 57.4 | Not recorded | 69ba31840636e5bf4afc076d |
| NLLB-200 | 57.2 | Not recorded | 69ba31840636e5bf4afc076d |
| MADLAD | 57.2 | Not recorded | 69ba31840636e5bf4afc076d |
| LLaMA 3 70B | 56.7 | Not recorded | 69ba31840636e5bf4afc076d |
| EuroLLM | 55.7 | Not recorded | 69ba31840636e5bf4afc076d |
| TranslateGemma | 55.4 | Not recorded | 69ba31840636e5bf4afc076d |
| GPT-OSS 20B | 54.8 | Not recorded | 69ba31840636e5bf4afc076d |
| Tower+ | 54.5 | Not recorded | 69ba31840636e5bf4afc076d |
| Tiny Aya Global | 53.6 | Not recorded | 69ba31840636e5bf4afc076d |
| LLaMA 3 8B | 51.4 | Not recorded | 69ba31840636e5bf4afc076d |
| Aya-101 | 48.5 | Not recorded | 69ba31840636e5bf4afc076d |
| Aya Expanse | 48 | Not recorded | 69ba31840636e5bf4afc076d |
| Hunyuan-MT | 45.6 | Not recorded | 69ba31840636e5bf4afc076d |

### Gemma 3

ChrF++: 58.6. Result ID: 69ba637447f34ce924a44bf5.

[Reporting paper](<https://www.sota2.com/research/paper/69ba31840636e5bf4afc076d.md>)

Recorded evaluation configuration: Not recorded. This record does not assert independent reproduction.

### GPT-OSS 120B

ChrF++: 58.2. Result ID: 69ba637447f34ce924a44bf7.

[Reporting paper](<https://www.sota2.com/research/paper/69ba31840636e5bf4afc076d.md>)

Recorded evaluation configuration: {"Parameters":"120B"}. This record does not assert independent reproduction.

### OMT-NLLB

ChrF++: 57.6. Result ID: 69ba637447f34ce924a44bf2.

[Reporting paper](<https://www.sota2.com/research/paper/69ba31840636e5bf4afc076d.md>)

[Method origin paper](<https://www.sota2.com/research/paper/69ba31840636e5bf4afc076d.md>)

Recorded evaluation configuration: Not recorded. This record does not assert independent reproduction.

### OMT-LLaMA 8B

ChrF++: 57.4. Result ID: 69ba637447f34ce924a44bf3.

[Reporting paper](<https://www.sota2.com/research/paper/69ba31840636e5bf4afc076d.md>)

[Method origin paper](<https://www.sota2.com/research/paper/69ba31840636e5bf4afc076d.md>)

Recorded evaluation configuration: {"Parameters":"8B"}. This record does not assert independent reproduction.

### NLLB-200

ChrF++: 57.2. Result ID: 69ba637447f34ce924a44bf4.

[Reporting paper](<https://www.sota2.com/research/paper/69ba31840636e5bf4afc076d.md>)

Recorded evaluation configuration: Not recorded. This record does not assert independent reproduction.

### MADLAD

ChrF++: 57.2. Result ID: 69ba637447f34ce924a44bf9.

[Reporting paper](<https://www.sota2.com/research/paper/69ba31840636e5bf4afc076d.md>)

[Method origin paper](<https://www.sota2.com/research/paper/68fa70921e209131cea4bece.md>)

Recorded evaluation configuration: Not recorded. This record does not assert independent reproduction.

### LLaMA 3 70B

ChrF++: 56.7. Result ID: 69ba637447f34ce924a44bf8.

[Reporting paper](<https://www.sota2.com/research/paper/69ba31840636e5bf4afc076d.md>)

Recorded evaluation configuration: {"Parameters":"70B"}. This record does not assert independent reproduction.

### EuroLLM

ChrF++: 55.7. Result ID: 69ba637447f34ce924a44c01.

[Reporting paper](<https://www.sota2.com/research/paper/69ba31840636e5bf4afc076d.md>)

Recorded evaluation configuration: Not recorded. This record does not assert independent reproduction.

### TranslateGemma

ChrF++: 55.4. Result ID: 69ba637447f34ce924a44bf6.

[Reporting paper](<https://www.sota2.com/research/paper/69ba31840636e5bf4afc076d.md>)

Recorded evaluation configuration: Not recorded. This record does not assert independent reproduction.

### GPT-OSS 20B

ChrF++: 54.8. Result ID: 69ba637447f34ce924a44bfa.

[Reporting paper](<https://www.sota2.com/research/paper/69ba31840636e5bf4afc076d.md>)

Recorded evaluation configuration: {"Parameters":"20B"}. This record does not assert independent reproduction.

### Tower+

ChrF++: 54.5. Result ID: 69ba637447f34ce924a44bfc.

[Reporting paper](<https://www.sota2.com/research/paper/69ba31840636e5bf4afc076d.md>)

[Method origin paper](<https://www.sota2.com/research/paper/68fa72531e209131cea55a2f.md>)

Recorded evaluation configuration: Not recorded. This record does not assert independent reproduction.

### Tiny Aya Global

ChrF++: 53.6. Result ID: 69ba637447f34ce924a44bfe.

[Reporting paper](<https://www.sota2.com/research/paper/69ba31840636e5bf4afc076d.md>)

[Method origin paper](<https://www.sota2.com/research/paper/69b399ef0636e5bf4afbc93b.md>)

Recorded evaluation configuration: Not recorded. This record does not assert independent reproduction.

### LLaMA 3 8B

ChrF++: 51.4. Result ID: 69ba637447f34ce924a44bfd.

[Reporting paper](<https://www.sota2.com/research/paper/69ba31840636e5bf4afc076d.md>)

Recorded evaluation configuration: {"Parameters":"8B"}. This record does not assert independent reproduction.

### Aya-101

ChrF++: 48.5. Result ID: 69ba637447f34ce924a44bfb.

[Reporting paper](<https://www.sota2.com/research/paper/69ba31840636e5bf4afc076d.md>)

Recorded evaluation configuration: Not recorded. This record does not assert independent reproduction.

### Aya Expanse

ChrF++: 48. Result ID: 69ba637447f34ce924a44c00.

[Reporting paper](<https://www.sota2.com/research/paper/69ba31840636e5bf4afc076d.md>)

Recorded evaluation configuration: Not recorded. This record does not assert independent reproduction.

### Hunyuan-MT

ChrF++: 45.6. Result ID: 69ba637447f34ce924a44bff.

[Reporting paper](<https://www.sota2.com/research/paper/69ba31840636e5bf4afc076d.md>)

Recorded evaluation configuration: Not recorded. This record does not assert independent reproduction.

Page 1 of 1. This is an index page, not the full collection.
